Durable High Early Strength Concrete

Project Details
STATE

KS

START DATE

09/15/16

END DATE

06/14/19

RESEARCHERS

Mustaque Hossain

SPONSORS

KS DOT

KEYWORDS

Concrete bridges; Concrete pavements; High strength concrete; Mix design; Service life

Project description

The objective of this research project is to develop high early strength concrete mixture criteria or designs that can do the following: (1) satisfy current Kansas Department of Transportation (KDOT) minimum strengths for opening to traffic in 4 to 24 hours; and (2) provide a 20-year pavement or 50-year bridge service life.