Long-Life Slab Replacement Concrete

Project Details
STATE

FL

SOURCE

TRID

START DATE

03/01/13

END DATE

01/01/16

RESEARCHERS

Abla Zayed, Kyle Riding, Christopher C. Ferraro, Andre Bien-Aime, Natallia Shanahan, Daniel Buidens, Thomas Meagher, Victor Tran, Justin D. Henika, Jerry M. Paris, Caitlin M. Tibbetts, Benjamin E. Watts

SPONSORS

FDOT

KEYWORDS

Concrete, Cracking, Maintenance, Rehabilitation (Maintenance), Service life, Slabs

Project description

The objectives of this project are to (1) identify the factors or parameters contribuitng to the cracking of concrete replace slabs on FDOT projects and (2) recommend changes to FDOT specifications and/or procedures that will minimize the occurrence of cracking of concrete used for Florida DOT slab replacement projects.